Washington Dulles
International Airport
Lea+Elliott is currently
advising Metropolitan Washington Airports Authority (MWAA) on the implementation of a new underground
APM system at Washington Dulles International
Airport. The APM will be for security-cleared passengers
and will connect the existing main terminal and
Concourse B (Tier 1) with a new Tier 2 concourse. Lea+Elliott’s responsibilities are:
-
Planning –
Ridership estimates, operation and maintenance
scenarios and guideway switch requirements;
-
Preliminary Design
– Defining the route alignment and train requirements;
-
Procurement Documents
- Developing the Request for Proposals, General
Provisions, Special Provisions, Technical Provisions,
Reference Drawings, and the Operations and Maintenance
Provisions;
-
Scheduling -
Developing the overall project schedule from project
definition through procurement, design and
implementation;
-
Fixed Facilities -
Developing the APM tunnel, stations, maintenance and
storage, electrical power and central control room
design criteria necessary to accommodate the APM
operating system equipment;
-
Contractor Selection
- Assisting and advising MWAA in the evaluation of the
APM proposals;
-
Implementation
Oversight – Design reviews, manufacturing,
installation, testing, and commissioning.